Starting from Period 89 ESO will request the Phase 2 material for VLT/UT2 Service Mode runs to be prepared with the new P2PP v3.2 tool. This is a newly designed upgrade of the current Phase 2 Proposal Preparation Tool (v. 2.13) which includes new important concepts on how Observation Blocks can be linked together. Many programmes will benefit from these enhanced features.
In order to assist prospective ESO Service Mode users in the preparation of their Phase 2 material, the ESO User Support Department is organizing a workshop on Thursday January 12, 2012 at ESO Garching, Germany. The program will include:
- An overview of the Phase 2 process
- An overview of the new Phase 2 tools and resources available to Service Mode users
- A hands-on tutorial of the new P2PP3 tool and face-to-face assistance with Phase 2 material preparation
If you are interested in attending this workshop, please register as soon as possible. The number of participants will be limited to ~30. Priority will be given to users who have been observing regularly and/or will have been awarded time on any UT2 instrument for Period 89. This is because the new Phase 2 tools will be deployed first on UT2 (Period 89), and later on the remaining Unit Telescopes and VLTI (deployment foreseen for P90). In late spring / early summer 2012, we will organize a similar workshop with tutorials for all remaining VLT/I instruments (in preparation for Phase 2 for Period 90).
Participants are expected to bring a laptop with P2PP3 already installed.
